Construction Info

View Interactive Map | Download Map PDF
The scope of work as a part of the Maine Power Reliability Program in
Benton consists of the construction of a new
substation, and transmission line upgrades within existing transmission
line corridors.
Albion Road Substation: The MPRP project in Benton includes the construction of a new 345/115kV substation. The new substation will be located on a 60-acre parcel owned by CMP on Albion Road approximately 650 feet north of the Albion Road. A total of 11.4 acres will be permanently developed to include the 10.4 acre substation yard (approximately 650’x700’) and the new gravel access road located on the Albion Road.
The substation yard will include construction of control house, approximately 32 x 80 feet in size, to be located near the center of the yard.
The purpose of the
substation will be to step down voltage from 345 kV to 115 kV and to
provide switching capacity, a common process that involves the transfer
or discontinuance of electrical load to other substation equipment or
overhead lines for maintenance work and during line outages. The new
substation will provide a needed supply source and improved voltage
regulation to this part of the state. A total of five 115 kV
terminations and two 345 kV terminations will interconnect at the
substation. System reliability will be greatly improved by this added
infrastructure and the current system risks of extensive area outages
will be greatly diminished by the added electrical supply.
Transmission Lines: The
construction of approximately 4.3 miles of new 345 kV transmission line
on H-frame structures approximately 75 feet in height will take place
on the west side of the existing corridor next to an existing 115kV line
that runs north to south from Clinton to the Winslow town lines.
Additionally, the upgrading of transmission lines will include the rebuilding of approximately 0.2 miles of existing 115 kV line (Section 67) where the line enters the new substation from the north on monopole structures approximately 75 feet in height and the rebuilding of approximately 1.1 miles of existing 115kV line from the new substation to the Winslow Town line on monopole structures approximately 75 feet in height in between the existing 115 kV line and the new 345 kV line.
Approval of permits by planning board
Download PDF
Approval of permit by planning board and/or CEO
Download PDF
Approval of permit by planning board and/or CEO
Download PDF
Permit for rainwater drainage tank at Albion Rd Substation
Download PDF
Application submitted to town for necessary permits
Download PDF
The delivery of the Larrabee Road Substation Autotransformer
Read More
Attention travelers! Possible delays on Route 202 between Greene and Lewiston
Read More
CMP’s $1.4 billion upgrade project on schedule and budget
Read More
The installation will occur north of Albion Road Substation
Read More
Construction continues
Read More
Construction is ongoing as contractors focus on installing equipment and finishing entrance road
Read More
Roadway reconstruction of Albion Road in Benton is scheduled to begin early next month
Read More
Anthony Iannello and Jared Haney, L.E. Myers Co., fought a barn fire on Troy Rd. in Detroit while returning from MPRP jobsite.
Read More
Photos of the massive 345-kV autotransformer being delivered to Benton from Searsport.
Read More
Autotransformer is en-route to Albion Road Substation
Read More
Crews are surveying and flagging the Section 67 corridor from Windsor to Benton
Read More
"Jobs Meet Reliability" - How the MPRP is Strengthening Maine's Grid and Economy
Read More
241 acres of land surrounding Mud Pond in Monmouth transferred for conservation
Read More
Hundreds of ospreys nest on our utility poles. We share your concerns for the safety of these birds, and our company has policies and personnel in place to manage these nests responsibly.
Read More
New Albion Road Substation in Benton making progress as foundation work begins
Read More
Portland Press Herald/ Maine Sunday Telegram article highlights work of local timber mat suppliers for the MPRP
Read More
Clearing in Benton, Clinton and Pittsfield is near completion. Crews are trimming and mowing, with limited clearing on hold until road postings are lifted.
Read More
Crews are rebuilding a portion of Section 67A across Albion Road from the new substation site.
Read More
Looking for project information about the Maine Power Reliability Program in your community? Select your town or city from the drop-down list to find construction updates, permits, maps and more.
* If your town's not here, then we're not there